Docs / BATMAN AIO
Production Ready
Documentation
BATMAN AIO Documentation.
Datasheet, connector pinout, key electrical ratings, and a step-by-step hardware and software setup guide for BATMAN AIO.
Key Electrical & Mechanical Ratings
Datasheet
BATMAN AIO Datasheet
Pinout Diagram
Connector Map
PINSignalFunction
1VBAT+Battery power input, 3S–8S (direct VM)
2GNDPower ground return
3CAN_HCAN-bus differential high
4CAN_LCAN-bus differential low
5TELEM_TXUART telemetry transmit, 3.3V
6TELEM_RXUART telemetry receive, 3.3V
Setup Guide
Hardware & Software Installation
Follow each step in order. Use Next Step to move forward once a step is complete.
1Hardware Installation
2Software Installation
3Firmware & Configuration
4First Power-On
Step 1 — Hardware Installation
Mount the board and wire power, motors & peripherals
- Mount BATMAN AIO on the standard 30.5×30.5mm pattern using vibration-dampening grommets, torqued to 0.4N·m.
- Connect the battery directly to the VM pads, observing polarity — input is unregulated and protected by a 36V TVS clamp.
- Connect all four motors to the M1–M4 pads following the documented rotation/mixing order for your frame.
- Wire GPS, VTX, receiver, telemetry, lidar and dual camera to their labeled ports.
- Inspect the conformal coating for damage before closing up the airframe.
Need help with BATMAN AIO integration?
Our engineering team supports bring-up, calibration, and program integration directly.